Backgrounds

The Ashkhabad Olympic Stadium, located in Ashgabat, Turkmen, was launched in 2003 as a multi-purpose stadium and rebuilt in 2013-2017 for the bid for the Olympic Games. . The new stadium-centered venue is a modern creation with a symbolic sculpture of Ahal Teke.

Analytical Process

Jilin-1 constellation has made a recording of the construction of the newly-built comprehensive stadium between April of 2016 and May of 2017.

On April 25, 2016, the basic frame of the architecture was completed, followed by the ceiling,, which can be seen from the image below.

On June 4, 2016, after 40 days’ work, nearly 25% of the external ceiling was finished.

On August 16, 2016, 73 days later, Approximately 85% of the exterior of the ceiling was finished at an accelerated pace.

By May 1, 2016, the ceiling project of the Ashkhabad Olympic stadium was concluded  with the interior construction started in the wake.